Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.11586284
- Product Categories
- Friendly Links
- home > Supply > Wear-resistant composite pipe manufacturer tailings tailings wear-resistant composite pipe distributors
Wear-resistant composite pipe manufacturer tailings tailings wear-resistant composite pipe distributors
Information Name: | Wear-resistant composite pipe manufacturer tailings tailings wear-resistant composite pipe distributors |
Published: | 2013-12-05 |
Validity: | 30 |
Specifications: | |
Quantity: | 1233500.00 |
Price Description: | |
Detailed Product Description: | Tailings abrasion wear resistance of composite pipe manufacturer tailings composite pipe distributor Pipe Co., Ltd., Luoyang Guorun headquartered in Luoyang Airport ultra-high molecular materials Innovation Park, is engaged in domestic UHMWPE product development, production, sales leader. The company's main ultra-high molecular weight polyethylene pipe, wear pipes, corrosion-resistant pipes, mining pipe, super pipe, ultra-high molecular weight polyethylene plastic pipe, ultra high molecular weight polyethylene pipe, ultra-high molecular tubes, Polymer pipes, polyethylene pipes are "high-tech enterprises in Henan Province", "ultra-high molecular weight polyethylene Luoyang Engineering Technology Research Center," for three consecutive years in Luoyang City integrity enterprises advanced units title. Our factory covers an area of ??300 acres, welcome to visit our factory! Contact Li: 135 = 2345 = 6O22 general use Butt or melt socket connection, flange connection, to cover the steel flange to the flange root, root and then melt into the polymer tube flange on. Polymer pipe connections should note the following: 1, pipe connections, pipes and fittings to respond and ancillary equipment according to the design requirements for verification and should be visually inspected at the construction site, to meet the requirements before use. The main inspection items include pressure levels, the outer surface quality, with quality, material consistency; tailings tailings abrasion wear resistance of composite pipe manufacturer distributor 2 composite pipe, tubing and fittings should be placed some time at the construction site then connect to make a consistent temperature pipes and fittings; 3, using the pipe welding way linked, should use the same grade of material for pipes and fittings, the performance must go through a similar test can be carried out after passing; tailings wearable wear-resistant composite pipe manufacturer tailings composite pipe distributor 4, in cold and windy weather to connect environmental conditions, should take protective measures or adjust the connection process; 5, piping connecting pipe end should be clean, knock off the tube every time I should be temporarily blocked to prevent debris entering the pipe; 6 should use the appropriate special heating tool according to different interface forms not use an open flame heating pipes and fittings. Wear-resistant composite pipe manufacturer tailings tailings wear-resistant composite pipe distributors buy high-quality polymer tube on to our company, and we look forward to your visit. Mine melt connection pipe is connected and fused connection. Hot melt connection is divided Butt melt socket connections and connections, fused connection socket connection fused and fused into a saddle-type connectors. We use the connection Butt construction, its main steps are: 1 material preparation: the pipe or tube placed in a flat position, placed on the docking machine, left foot 10-20mm cutting margin. Tailings abrasion wear resistant composite pipe manufacturer tailings composite pipe clamp Dealer 2: According to the welded pipe, pipe fittings to choose the right kava fixtures, clamping tubes, ready to cut. 3 cutting: cutting the pipe sections, fittings end surface impurities and oxide layer, ensure that the two butt end formation, smooth, free of impurities. 4 pairs: two pipe sections to be completely on the end face, the smaller the better the wrong side, the wrong side of the wall thickness of no more than 10%. Otherwise, it will affect the quality of the docking. 5 heating: Docking temperature is generally between 210-230 ℃ appropriate, winter heating plate heating time are different in both ends of the length of the melt surface is preferably 1-2mm. 6 Switching: the heating plate away, quickly allowing two end faces of the hot melt viscosity and the pressure, in order to ensure the quality of the molten docking switching cycle as short as possible. 7 molten docking: is the key to welding, the docking process should always be in the melt pressure, curling width of 2-4mm appropriate. 8 Cooling: Keep the pressure constant butt, so the interface slow cooling, cooling duration curling stiff hand touch, feel the heat prevail. 9 docking Completion: After cooling release slips away docking machine, re-prepare the next interface. We always insist on quality first, user supreme dedication to quality products and excellent service for the majority of users. Our company is well-known ultra-pipe manufacturer, we are committed to provide customers with the highest quality products, product quality assurance, reasonable price, is your best choice. If this point you just want to know what is the ultra-high tube fouling resistance. That right now is a very good chance. |
Admin>>>
You are the 10009 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Jinhui Mechanical and Electrical Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 10009 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Jinhui Mechanical and Electrical Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility